Yichang Flow‑Battery Energy Storage Power Station Project
This is Yichang’s first‑of‑its‑kind new‑energy‑storage project with a capacity of 50 MW, directly dispatched by the provincial electric power company. The power station is configured with 13 energy‑storage units. When the power grid generates excess electricity with insufficient consumption capacity, surplus power can be stored in the energy‑storage station; when power supply falls short of demand, the station discharges stored energy. It delivers a maximum discharge power of 50 MW with a four‑hour continuous discharge duration, equivalent to the power output of 5.4 million 10 000‑mAh power banks.
Technical Specifications