Energy Storage Project for a Coal Mine in Hebei

The project utilizes available land within the coal mine area to deploy an energy storage system. The system is designed for grid connection at either 6 kV or 10 kV, with a 1,500 V DC system architecture.The energy storage system can be centrally dispatched by the grid and supports independent AGC/AVC control, enabling participation in grid peak shaving, frequency regulation, and other ancillary services. At the same time, it provides a reliable power supply and emergency backup support for the mine, ensuring continuous and stable electricity supply for mining operations.

Energy Storage Project for a Coal Mine in Hebei

Technical Specifications